150 workers were engaged to finish a piece of work in a certain number of days. Four workers dropped the second day, four workers dropped the third day and so on. It takes 8 more days to finish the work now. Find the number of days in which the work was completed.
Answer
685.8k+ views
Hint: Here the drop in the number of workers remains constant everyday, so the concept of arithmetic progression is used to find the number of days in which the work can be completed.
Complete step-by-step answer:
Let the work finish in n days when the workers stopped dropping so that the total number of workers who worked all these days is the sum of A.P.
$ \Rightarrow 150 + 146 + 142 + .......n$
We know the formula of finding the sum of first n terms
$
\Rightarrow \dfrac{n}{2}[2a + (n - 1) \times d] \\
\Rightarrow \dfrac{n}{2}[2(150) + (n - 1)( - 4)] \\
\Rightarrow n(152 - 2n) \to (1) \\
$
If the workers had not dropped, then the work would have finished in ‘n-8’ days with 150 workers on each day i.e.., $150(n - 8) \to (2)$
Now
$
n(152 - 2n) = 150(n - 8) \\
\Rightarrow {n^2} - n - 600 = 0 \\
\Rightarrow {n^2} - 25n + 24n - 600 = 0 \\
\Rightarrow n(n - 25) + 24(n - 25) = 0 \\
\Rightarrow (n - 25)(n + 24) = 0 \\
$
Number of days cannot be negative so we won’t consider n=-24.
$
\Rightarrow (n - 25) = 0 \\
\Rightarrow n = 25 \\
$
Answer is 25 days.
The work will be complete in 25 days.
Note: If the specific number of workers dropped continuously then there would be a series. Find the series and apply the sum of first n terms in A.P. series after that follow some simple logic to get the number of days in which the work will be completed.
Complete step-by-step answer:
Let the work finish in n days when the workers stopped dropping so that the total number of workers who worked all these days is the sum of A.P.
$ \Rightarrow 150 + 146 + 142 + .......n$
We know the formula of finding the sum of first n terms
$
\Rightarrow \dfrac{n}{2}[2a + (n - 1) \times d] \\
\Rightarrow \dfrac{n}{2}[2(150) + (n - 1)( - 4)] \\
\Rightarrow n(152 - 2n) \to (1) \\
$
If the workers had not dropped, then the work would have finished in ‘n-8’ days with 150 workers on each day i.e.., $150(n - 8) \to (2)$
Now
$
n(152 - 2n) = 150(n - 8) \\
\Rightarrow {n^2} - n - 600 = 0 \\
\Rightarrow {n^2} - 25n + 24n - 600 = 0 \\
\Rightarrow n(n - 25) + 24(n - 25) = 0 \\
\Rightarrow (n - 25)(n + 24) = 0 \\
$
Number of days cannot be negative so we won’t consider n=-24.
$
\Rightarrow (n - 25) = 0 \\
\Rightarrow n = 25 \\
$
Answer is 25 days.
The work will be complete in 25 days.
Note: If the specific number of workers dropped continuously then there would be a series. Find the series and apply the sum of first n terms in A.P. series after that follow some simple logic to get the number of days in which the work will be completed.
Recently Updated Pages
If x a + bt + ct2 where x is in meters and t is in class 11 physics CBSE

A car covers the first half distance between two places class 11 physics CBSE

The resultant of two vectors overrightarrow P and overrightarrow class 11 physics CBSE

Find the value of cos 135 class 11 maths CBSE

A mass M is held in place by an applied force F and class 11 physics CBSE

A solution of glucose in water is labelled as 10 dfracwv class 11 chemistry CBSE

Trending doubts
One Metric ton is equal to kg A 10000 B 1000 C 100 class 11 physics CBSE

Find the value of the expression given below sin 30circ class 11 maths CBSE

Draw a diagram of nephron and explain its structur class 11 biology CBSE

10 examples of friction in our daily life

Proton was discovered by A Thomson B Rutherford C Chadwick class 11 chemistry CBSE

Bond order ofO2 O2+ O2 and O22 is in order A O2 langle class 11 chemistry CBSE

