A and B can complete a task in 12 days. However, A had to leave a few days before the task was complete and hence it took 16 days in all to complete the task. If A alone could complete the work in 21 days, how many days before the work getting over did A leave ?
Answer
666.3k+ views
Hint: Efficiency is defined as the work done in one day. So, to find the number of days in which B alone can do work we must first, find the efficiency of B ( i.e. work done by B in one day ).
Complete step-by-step answer:
If we had to find the days in which B alone can do the work so by the formula
\[ \Rightarrow \dfrac{{{\text{days taken by }}(A + B){\text{ }} \times {\text{ days taken by }}A{\text{ alone}}}}{{{\text{days taken by }}A{\text{ alone - days taken by }}(A + B)}}\]
So, \[ \Rightarrow \dfrac{{12 \times 21}}{{21 - 12}} = \dfrac{{252}}{9}\]= 28 days
So, B alone can do the work in 28days.
Now let us assume that A worked for ‘x’ number of days.
A can do \[\dfrac{1}{{21}}\]work in a day and B can do \[\dfrac{1}{{28}}\]work in a day and as we know that B worked for 16 days and A worked of ‘x’ days ( by assumption ).
So, the work done by A + work done by B = total work ( i.e. 1 )
\[ \Rightarrow \dfrac{x}{{21}}\; + \;\dfrac{{16}}{{28}}\; = \;1\]
Now solving this equation
\[ \Rightarrow \dfrac{x}{{21}}\; = \;\;1 - \dfrac{{16}}{{28}}\]
Now taking L.C.M and solving it will give us the value of ‘x’
\[ \Rightarrow x = {\text{ }}\dfrac{{12}}{{28}}\,\, \times \;21\; = 9\]days
Now, A worked for 9 days and the total work was completed in 16 days.
So, A left the work ( 16 – 9 ) days before the completion of work.
Hence A leaves the work 7 days before.
Note: Whenever this type of problem is seen then we must firstly know the work done by all the participants ( here A and B ) in a day or in an hour and this is known as the efficiency of the particulars. And if we know the work done by them in one day then we will easily calculate the work done by them in a given time. So this will make it easy for us to find the result that we are supposed to get.
Complete step-by-step answer:
If we had to find the days in which B alone can do the work so by the formula
\[ \Rightarrow \dfrac{{{\text{days taken by }}(A + B){\text{ }} \times {\text{ days taken by }}A{\text{ alone}}}}{{{\text{days taken by }}A{\text{ alone - days taken by }}(A + B)}}\]
So, \[ \Rightarrow \dfrac{{12 \times 21}}{{21 - 12}} = \dfrac{{252}}{9}\]= 28 days
So, B alone can do the work in 28days.
Now let us assume that A worked for ‘x’ number of days.
A can do \[\dfrac{1}{{21}}\]work in a day and B can do \[\dfrac{1}{{28}}\]work in a day and as we know that B worked for 16 days and A worked of ‘x’ days ( by assumption ).
So, the work done by A + work done by B = total work ( i.e. 1 )
\[ \Rightarrow \dfrac{x}{{21}}\; + \;\dfrac{{16}}{{28}}\; = \;1\]
Now solving this equation
\[ \Rightarrow \dfrac{x}{{21}}\; = \;\;1 - \dfrac{{16}}{{28}}\]
Now taking L.C.M and solving it will give us the value of ‘x’
\[ \Rightarrow x = {\text{ }}\dfrac{{12}}{{28}}\,\, \times \;21\; = 9\]days
Now, A worked for 9 days and the total work was completed in 16 days.
So, A left the work ( 16 – 9 ) days before the completion of work.
Hence A leaves the work 7 days before.
Note: Whenever this type of problem is seen then we must firstly know the work done by all the participants ( here A and B ) in a day or in an hour and this is known as the efficiency of the particulars. And if we know the work done by them in one day then we will easily calculate the work done by them in a given time. So this will make it easy for us to find the result that we are supposed to get.
Recently Updated Pages
A Paragraph on Pollution in about 100-150 Words

What is BLO What is the full form of BLO class 8 social science CBSE

10 examples of friction in our daily life

Draw a diagram of nephron and explain its structur class 11 biology CBSE

Write structures of the following compounds i 2 Chloro3methylpentane class 11 chemistry CBSE

XIX+XXX A 49 B 51 C 55 D 44 class 5 maths CBSE

Trending doubts
Explain the Treaty of Vienna of 1815 class 10 social science CBSE

1 GB equals how many MB?

10 examples of evaporation in daily life with explanations

What is the full form of POSCO class 10 social science CBSE

Which is the hottest planet in the Solar system A Earth class 10 social science CBSE

Name any four life processes in living things class 10 biology CBSE